Gas, oil, repair and maintenance (from Cubbage 1981) Labor costs: $5.00 per scheduled hour plus 30% fringe benefits ($6.50/ 50% utilization) Total cost per productive hour for chainsaw operation: Piling costs: $4.50 per scheduled hour plusanbsp;...
Title | : | Production and costs of manual delimbing, bucking, and piling in thinnings |
Author | : | Bryce J. Stokes, B. L. Lanford, Southern Forest Experiment Station (New Orleans, La.) |
Publisher | : | - 1986 |
You must register with us as either a Registered User before you can Download this Book. You'll be greeted by a simple sign-up page.
Once you have finished the sign-up process, you will be redirected to your download Book page.
How it works: